Menu

Next Generation Health Club, Kings Park

PROJECT DETAILS

Client

Next Generation Group

Value

$20m

Year Completed

2008

Role

Structural Consultants

Next Generation Health Club, Kings Park

Next Generation Kings Park is a 5 level building housing squash courts and change rooms over two levels in the basement, a 25 metre pool, pool plant room, lounge, kitchen, restaurant, minor retail and bar facilities at ground floor, gymnasium at first floor and a roof top bar and a 10 metre pool and roof deck with stunning views over Kings Park and the City. Work included refurbishment of the existing stands, new carparks and entry roads and reinstatement of tennis courts.

The suspended structure needed to support heavy pool structures over large column free spans, without leaks. A post tensioned slab was designed. The pool structures were kept totally separate from the building structure, so if they leaked, falls and fulgo outlets were incorporated into the base structure to catch the water. Pool structures were seated on rubber pads to avoid the building sway from moving water.

EXPLORE OUR PROJECTS