PROJECT DETAILS
ClientKien Huat Development |
ValueRM 60m |
Year Completed1995 |
RoleStructural design of building, cranes and equipment supportsDesign and documentation including space allocation for electrical, control rooms, staff amenities and plant requirements |
The project called for a new building to house
- A re-located industrial paper machine from Singapore
- Waste paper fibre recovery plant
- A paper coating machine
Project Data: The building is 130 metres long by 42 metres wide and 3 storeys high.
The ground floor structure consists of a piled raft slab on a 6 metre pile grid. The upper slabs are constructed in in-situ concrete to carry heavy equipment.
The roof structure includes the support of 25 tonne SWL gantry cranes